R2.10
Belongs to
This rule is defined in the Uttlesford design code
Design code rule details
- Reference
- R2.10
- Name
- No name provided
- Description
- All proposals must provide detailed information on the water extraction and waste disposal of their construction approach.
- Categories
- Organisation
- local-authority:ESS
Design code areas
No specific areas provided.
So rule COULD apply to any area found in the Uttlesford design code.