Design code rule

R2.10

Belongs to

This rule is defined in the Uttlesford design code

Design code rule details

Reference
R2.10
Name
No name provided
Description
All proposals must provide detailed information on the water extraction and waste disposal of their construction approach.
Organisation
local-authority:ESS

Design code areas

No specific areas provided.

So rule COULD apply to any area found in the Uttlesford design code.