R2.9
Belongs to
This rule is defined in the Uttlesford design code
Design code rule details
- Reference
- R2.9
- Name
- No name provided
- Description
- All proposals must outline the carbon footprint of their proposed construction strategy and as part of the whole life carbon assessment undertaken. This should include steps taken to minimise impact.
- Categories
- Organisation
- local-authority:ESS
Design code areas
No specific areas provided.
So rule COULD apply to any area found in the Uttlesford design code.